Guides, Research
From drill hole to mine: the stages of a mining project
What each stage means, what usually moves a company forward, and where the risk sits.
November 5, 2026
Most mining projects never become mines. Knowing which stage a company is at tells you what kind of risk you are taking and what news matters.
Exploration
The company is looking for a deposit. News comes from mapping, geophysics and drilling. Most of the risk is geological: there may be nothing economic to find. Results can move a share price sharply in either direction.
Resource definition
Drilling has found something, and the work shifts to measuring it. The company publishes a mineral resource estimate under NI 43-101. This gives the deposit a size and grade, though not proof that it can be mined at a profit.
Economic studies
Next comes a preliminary economic assessment, then a prefeasibility study, then a feasibility study. Each adds engineering detail and confidence. Mineral reserves can only be declared at the prefeasibility level or above.
Permitting
The company seeks approval from governments and works with local communities. This can take years, and the timeline depends heavily on the jurisdiction. Environmental baseline studies often start long before an application is filed.
Financing and construction
Building a mine usually takes a mix of equity, debt, and sometimes streams, royalties or offtakes. Once a construction decision is made, the risk shifts from geology to cost and schedule.
Ramp up and production
A new mine rarely reaches full capacity on day one. The first year is often harder and more expensive than planned. After that, attention moves to costs, grades, and how long the mine can keep going.
How to use this
Before buying into any story, ask what stage the company is at and what has to go right to reach the next one. The news that matters at each stage is different, and so is the way it can go wrong.